Combined Heat and Power can work particularly well for UK businesses with consistent demand for both electricity and useful heat.
But what can the numbers look like on a real commercial project?
One anonymised CHP project reviewed by ELS involved an existing 354kWe system generating almost 2.2 million kWh of electricity per year.
The proposed Power Purchase Agreement included:
91% electrical self-consumption
12.99p/kWh PPA rate
23p/kWh existing grid electricity rate
10-year PPA term
and a modelled first-year net saving of approximately:
£219,000
The project is useful because it shows how CHP generation, onsite demand, heat output and PPA funding need to work together.
What is Combined Heat and Power and how does it work?
Combined Heat and Power, usually shortened to CHP, generates electricity while recovering heat that would otherwise be wasted during the generation process.
A business can therefore use both:
- electricity generated onsite
- useful heat produced at the same time
CHP tends to be most commercially interesting where a site has sustained demand for both.
That could include businesses with significant heating, hot water, production or process-heat requirements alongside high electricity consumption.
The important point is that simply installing a CHP system does not guarantee good economics.
The site needs to make productive use of what the system generates.
This real project shows why.
What did the 354kWe CHP project look like?
The project involved an existing commercial CHP system.
| Project measure | Example |
|---|---|
| CHP engine size | 354kWe |
| Annual CHP electricity generation | 2,198,791kWh |
| Annual site electricity consumption | 2,406,515kWh |
| Electrical self-consumption | 91% |
| Annual CHP heat generation | 2,920,964kWh |
| Existing grid electricity rate | 23p/kWh |
| Proposed PPA rate | 12.99p/kWh |
| PPA term | 10 years |
| PPA structure | Pay as Consumed |
| Modelled first-year net saving | Approx. £219,000 |
The proposal therefore combined substantial electricity generation with very high onsite consumption and significant heat output.
Why did 91% electrical self-consumption matter?
Because almost all of the electricity generated by the CHP system was expected to be used by the business itself.
The site consumed approximately 2.4 million kWh of electricity per year.
The CHP system was expected to generate approximately 2.2 million kWh.
With 91% electrical self-consumption, the generation profile was closely aligned with the site’s demand.
That matters commercially because electricity generated onsite can reduce the amount of electricity the business needs to source from the grid.
Generation is useful.
Generation that the business can actually consume is more useful.
What did the 12.99p/kWh PPA rate mean?
The proposed PPA rate was the price the business would pay for electricity generated by the CHP system and consumed onsite.
It was not an interest rate.
The proposal compared:
Existing grid electricity rate: 23p/kWh
with:
Proposed PPA rate: 12.99p/kWh
The agreement was structured as Pay as Consumed, meaning the customer paid for generated electricity consumed onsite, subject to the agreed minimum consumption level.
That minimum was 91%, matching the modelled electrical self-consumption.
The starting PPA rate is important, but it should not be considered in isolation.
Agreement length, indexation, minimum consumption, generation and the overall project structure all affect the commercial outcome. You can see these factors explained in more detail in our guide to what determines a commercial PPA rate.
How was a £219,000 first-year net saving modelled?
The proposal modelled a first-year net saving of approximately £219,000.
That figure should not be treated as a simple calculation based only on the difference between 23p/kWh and 12.99p/kWh.
It was the outcome of the wider project model.
The commercial characteristics included:
- almost 2.2 million kWh of annual CHP electricity generation
- 91% electrical self-consumption
- a 23p/kWh existing grid rate
- a 12.99p/kWh proposed PPA rate
- a 10-year Pay as Consumed agreement
- significant annual heat generation
Every CHP project will produce different numbers.
The useful lesson is that a system with strong generation and high onsite consumption can create a substantial commercial opportunity.
Why does CHP heat generation matter too?
Because electricity is only half of the CHP story.
This system was also expected to generate approximately:
2,920,964kWh of heat each year.
For a business that can make productive use of that heat, CHP can therefore provide value from two energy outputs at the same time.
That is one of the key differences between CHP and technologies such as Solar PV.
When assessing a CHP opportunity, businesses should therefore look at:
Can we use the electricity?
and:
Can we use the heat?
If both answers are yes, the project can become considerably more interesting.
Can an existing CHP system be purchased under a PPA?
Potentially, yes.
An existing commercial CHP system can be considered for purchase by a funder under a Power Purchase Agreement.
That can allow capital tied up in the existing asset to be released back into the business while the site continues using the electricity generated.
This creates an opportunity that owners of existing CHP equipment may not realise is available.
The system is already installed.
It is already generating energy.
But there may also be value sitting inside the asset that could potentially be released.
Whether that works commercially depends on the individual project.
What makes an existing CHP system suitable for a PPA?
A funder will need to understand both the energy performance and the commercial structure of the project.
Important factors include:
- CHP system size
- annual electricity generation
- site electricity consumption
- electrical self-consumption
- usable heat demand
- system age and condition
- current grid electricity cost
- expected operating life
- maintenance or refurbishment requirements
- proposed PPA term and rate
No one figure determines suitability.
The numbers need to work together.
What can another UK business learn from this CHP example?
Four points stand out.
High self-consumption matters
The system was expected to use 91% of its generated electricity onsite.
That strong alignment between generation and consumption helped support the commercial model.
Heat demand matters too
The CHP was producing almost 2.93 million kWh of annual heat as well as electricity.
A site able to use both outputs is very different from one that cannot.
Existing equipment can still hold financial value
A business does not necessarily need to be planning a new CHP installation to consider PPA funding.
An existing system may potentially be purchased under the PPA, allowing capital tied up in the asset to be released.
Look at the whole agreement
The 12.99p/kWh PPA rate matters.
But so do generation, self-consumption, heat usage, agreement length and the value of the asset.
The strongest decision comes from looking at the complete project.
Could your existing CHP system work under a PPA?
If your business already owns a commercial CHP system from around 50kW upwards, it may be worth exploring what the numbers could look like.
ELS can review:
- system size
- electricity generation
- site consumption
- heat generation
- self-consumption
- existing electricity costs
- system condition
- planned refurbishment or upgrades
From there, we can explore whether an existing-system Power Purchase Agreement could release capital back into the business and how much might potentially be available from the existing asset.
Already own a commercial CHP system? Let’s look at what it is generating and what the numbers could look like.
This article is based on an anonymised commercial CHP PPA proposal reviewed by ELS and additional case-study information supplied to ELS. The £219,000 figure is a modelled first-year net saving rather than a guaranteed or realised saving. All PPA arrangements remain subject to technical review, final commercial terms, system condition, energy performance and individual project assessment.